How Long Does a Kitchen Renovation Take in Montreal?

by Jasen Cabinetry Team·June 8, 2026
How Long Does a Kitchen Renovation Take in Montreal?

One of the most common questions Montreal homeowners ask is how long their kitchen renovation will take. The honest answer is that most kitchens take six to ten weeks from the day you start planning to the day you cook your first meal, but the timeline depends heavily on the scope and how early you order your cabinets. Here is a realistic breakdown.

Planning and Design (1 to 3 weeks)

Every successful renovation starts on paper. This phase covers measuring your space, choosing a layout, selecting cabinet styles and finishes, and finalizing your budget. The more decisions you lock in now, the fewer delays later.

  • Measure and confirm your layout
  • Choose cabinet style, color, and hardware
  • Approve a final quote and design

Ordering and Lead Time (1 to 6 weeks)

This is the step that makes or breaks your timeline. Cabinet lead time varies enormously by where you buy:

  • In-stock cabinets: Ready in days, the fastest path
  • Factory-direct orders: Typically 1 to 3 weeks
  • Fully custom orders: Often 4 to 8 weeks or more

Choosing in-stock or factory-direct styles is the single biggest way to shorten your overall project.

Demolition and Prep (2 to 4 days)

Once materials arrive, the old kitchen comes out. Demolition is quick, but this is also when hidden surprises appear, like outdated wiring or plumbing that needs attention before the new cabinets go in.

Installation (1 to 2 weeks)

With a clear space and cabinets on site, installation moves fast. Cabinets go in first, followed by countertop templating and fitting, then backsplash, sink, and appliances.

  • Cabinet installation: 2 to 4 days
  • Countertop template and install: adds about 1 week
  • Backsplash, plumbing, and finishing: 2 to 4 days

Where Delays Actually Happen

Most kitchen delays are not the installation itself. They come from late decisions, long custom lead times, and countertop templating, which can only happen after cabinets are installed. Ordering early and choosing in-stock styles removes the two biggest risks.

Start Your Timeline Today

The fastest way to a finished kitchen is to start planning now and order cabinets with a short lead time. Send us your dimensions and we'll prepare a quote within 24 hours, with realistic availability dates so you know exactly when your project can be done.